Kimberly-Clark moves product through a North American network of ten major distribution centers, shipping between 1,100 and 1,500 truckload equivalents a day. Its main problem was order bunching: shipments piled up during the week because planning, fulfillment and transportation systems did not talk to each other. The company fixed it with process changes and new planning technology, and the lessons apply to any large shipper.
How Kimberly-Clark’s North American network works
Kimberly-Clark, a global leader in personal care and professional products, moves goods through manufacturing sites, ten major distribution centers (DCs) and a set of shipping points across North America. According to Logistics Management, the company ships 1,100 to 1,500 truckload equivalents every day through that network.
At that volume, small timing problems become large costs. When orders bunch up during the week, volume reaches the same DCs and carriers at the same time, and the network has to absorb it with whatever trucks, dock doors and labor are available that day.

The problem: order bunching
Orders often bunched up during the week, which caused delays and raised operating costs. Kimberly-Clark’s analysis traced the pattern to disparate systems that did not communicate with each other, so no single view of the week existed across planning, fulfillment and transportation.
The goal after the pandemic was twofold: improve product availability and restore margins. Reaching it required a technical solution that could integrate those planning, fulfillment and logistics systems instead of patching each one separately.
A reset moment after the pandemic
Scott DeGroot, then vice president of global logistics at Kimberly-Clark, described the situation to Supply Chain Management Review in April 2023 as a “reset moment” for the network. With demand back to normal levels, the bunching could no longer be blamed on pandemic disruption. The company saw a chance to rethink how it deployed inventory.
The same interview made a second point that still holds for other shippers: DeGroot presented AI as something already at work in supply chain management, not a future ambition.
What Kimberly-Clark changed
The company combined process changes with new technology. It worked with ProvisionAi on LevelLoad, a cloud-based transportation planning and optimization application that uses machine learning and optimization algorithms to give planners real-time visibility and build transportation plans that bridge supply planning and execution. Kimberly-Clark’s own tool, EARL (Early AM Release and Leveling), was built on top of it. It runs daily, pulls data from the planning, TMS, WMS and ERP systems, and builds a 30-day deployment schedule that respects network capacity.
Speaking to SCMR, DeGroot said EARL helps planners deal with configuring many different items on one truck and can increase load fill by up to 3%. The pilot led to a rollout across all North American distribution sites. For the step-by-step design, the timeline and the measured results, read the full Kimberly-Clark case study.
Four lessons for other shippers
- Define the business problem before choosing a tool. DeGroot’s advice, as reported by Logistics Management, is to understand the business problem first and the technology second.
- Fix the process you are automating. He suggests deciding where the process needs to change, whether in deployment, stock allocation, transport planning or labor planning, before software takes it over.
- Connect the systems that plan with the systems that ship. Kimberly-Clark’s bunching came from systems that did not communicate. Better trucking alone would not have removed it.
- Look further ahead than the week. The design Kimberly-Clark built works on a 30-day horizon, so volume spikes are visible well before trucks have to be found.
What comes next for Kimberly-Clark
Logistics Management reported that Kimberly-Clark plans to apply AI-driven technology to optimize inbound freight movement and to extend the idea of level loading to its production schedules. The direction is upstream: the same smoothing logic that steadies outbound shipments is meant to steady what flows into the network and what plants produce.
Frequently asked questions
How big is Kimberly-Clark’s North American distribution network?
It includes manufacturing sites, ten major distribution centers and shipping points, and it ships 1,100 to 1,500 truckload equivalents a day, according to Logistics Management.
What problem did Kimberly-Clark have in its supply chain?
Order bunching. Orders piled up during the week, which caused delays and higher operating costs, because the systems for planning, fulfillment and logistics did not communicate with each other.
What did Kimberly-Clark use to fix it?
Process changes plus new planning technology. It built EARL, a daily planning tool, with ProvisionAi on top of LevelLoad, which builds a 30-day deployment schedule. The case study covers the design and the results.
See how it works in your network
If orders bunch up during the week in your network, the first step is to see where the volume piles up and why. LevelLoad builds a 30-day deployment schedule that smooths that volume before trucks have to be found. Read the full Kimberly-Clark case study, see how LevelLoad works, or talk to an expert.