Use Case · System Integration & Automation

Your systems don't talk
to each other. Your operations
pay for it daily.

Planning optimizes inventory. ERP manages orders. TMS moves trucks. WMS runs the warehouse. None of them know what the others are doing — and that gap is where freight cost, OTIF failures, and manual labor pile up.

75%Training time cutAutoO2 guided automation
60 daysAutoO2 to liveKickoff to first load
300+Parameters automatedPer load, every time
0Custom dev requiredCustomer-side
ERPSAP · Oracle JDE · Infor
feeds →
WMSManhattan · Blue Yonder · SAP EWM
feeds →
TMSManhattan · MercuryGate · Oracle TMS
feeds →
PlanningKinaxis · Blue Yonder · o9 · IBP
feeds →
ProvisionAI optimization layer
AutoO2Load optimization → visual plans back to WMS
→ WMS
LevelLoad30-day schedule → tenders back to TMS
→ TMS
The problem

Three gaps. All of them expensive.

Data trapped in silos

Each system makes locally rational decisions — none see the full picture. Plans look right on paper and fail on the floor.

4+ systems must align for every single shipment to execute correctly

Planning optimizes in a vacuum

Sophisticated planning systems calculate ideal replenishment without asking whether the warehouse can receive it, or the carrier can move it.

60% of daily variability eliminated when planning accounts for operational constraints

Manual processes absorbing expert time

Experienced staff spend hours building loads manually and reconciling carrier commitments — doing what software can do faster and more consistently.

75% less training time when expertise is encoded into the system, not the employee
How it connects

ProvisionAI sits inside your existing stack.
No rip-and-replace required.

Connected systems

How AutoO2 and LevelLoad
plug into your stack.

AutoO2 load optimization integrated with ERP and WMS
Load Optimization
AutoO2 — Load Optimization

Turns ERP and WMS data into executable, visual load plans — automatically.

AutoO2 pulls item master data, order details, and stacking constraints directly from your ERP and WMS — then generates an optimized load plan for every shipment without manual input.

ERP & WMS integration — reads item dimensions, weights, order composition. No manual data entry, no spreadsheet transfers.
Visual plan delivery — load plans appear as step-by-step instructions on warehouse screens. No new hardware required.
300+ parameters automated — weight limits, stacking rules, axle distribution, delivery sequencing. Every load, every shift.
60–90 days to live · no custom dev How AutoO2 works
LevelLoad network planning integrated with TMS and planning systems
Network Planning
LevelLoad — Network Planning

Bridges Planning, TMS, and carrier networks into one executable deployment schedule.

LevelLoad sits between your Planning system and TMS — reading 30 days of forecasted demand and translating it into a capacity-balanced schedule your carrier network can actually absorb.

Planning system integration — reads from Kinaxis, Blue Yonder, o9, IBP directly. No manual export or rekeying.
Automated TMS tendering — placeholder STOs trigger early carrier tenders through your TMS. Preferred carriers locked in days ahead.
97% first tender acceptance — carriers commit in advance because the schedule is predictable, not reactive.
~120 days to full deployment How LevelLoad works
Implementation

Live in 60–120 days. No custom development on your side.

60–90
AutoO2

From kickoff to live loads

ProvisionAI integrates with your ERP and WMS using standard APIs and file-based interfaces. Our implementation team manages the full onboarding — your IT team reviews and approves, not builds.

No customer-side custom development required. Integration uses standard APIs, file-based interfaces, and reusable integration patterns.
~120
LevelLoad

Full network deployment

LevelLoad integrates with your Planning system, TMS, and carrier network. The additional time reflects network configuration scope — not technical complexity.

Kimberly-Clark went from kickoff to full North American deployment in 10 months — across one of the most complex supply networks in CPG.
"AutoO2 gave our team a repeatable process — anyone can build an optimized load on day one, without weeks of training."
Zachary Dale — Supply Chain CI Manager, Riviana Foods
Zachary Dale Supply Chain CI Manager · Riviana Foods
75% Training time reduced
10k+ Annual loads automated
60–90 Days to go live

See how it fits your stack

No rip-and-replace. No custom dev.
Live in 60–120 days.

Tell us what's in your stack today. We'll show you exactly how ProvisionAI plugs in — and what changes on day one.